Display fireworks design & production · Northeast U.S.

Fireworks, engineered like an event, not a gamble.

Corporate galas, weddings, municipal celebrations, and concert pyrotechnics — choreographed to real music timing, cleared to real NFPA safety distances, and designed with real burn chemistry, not just a bigger shell.

24 Years in business
10 Displays on record
5 States served
0 Lost-time safety incidents
Signature tool 01

NFPA 1123 minimum-distance calculator

Real NFPA 1123 (Code for Fireworks Display) minimum-distance math — spectator viewing line and mortar-to-structure setback, computed from shell diameter, the same numbers our site plans are built from.

Planning reference only. Final site plans are reviewed and approved by the local Authority Having Jurisdiction (AHJ), which may require greater distances for wind, fallout area, or site-specific conditions.

Shell size Min. spectator distance Min. mortar-to-structure Conservative planning distance
3" 210 ft 210 ft 300 ft
4" 280 ft 280 ft 400 ft
5" 350 ft 350 ft 500 ft
6" 420 ft 420 ft 600 ft
8" 560 ft 560 ft 800 ft
10" 700 ft 700 ft 1,000 ft
12" 840 ft 840 ft 1,200 ft

NFPA 1123 minimum distance ≈ 70 ft × shell diameter (in.), 100 ft floor. Conservative planning distance is the widely used industry rule of thumb of 100 ft per inch of shell diameter, shown for comparison — not itself an NFPA figure.

420 ft
Spectator distance
Mortar-to-structure
Conservative planning
Mortar tube I.D.
Signature tool 02

Real choreography, cue by cue

A representative 4-minute finale sequence: 71 individual cues firing 374 shells across the show, escalating to 8 shells per second in the closing barrage — this is the same cue-sheet structure our firing software exports to the crew.

Time Shell / effect Position Qty Duration
00:00 8" Titanium Salute Rack C · Pos 6 3 5s
00:02 6" Ring Shell Rack B · Pos 2 2 4s
00:02 6" Ring Shell Rack D · Pos 9 2 4s
00:06 8" Brocade Crown Rack C · Pos 7 2 5s
00:11 6" Chrysanthemum Rack A · Pos 1 4 4s
00:15 4" Comet Mine Rack A · Pos 3 6 3s
00:18 4" Willow Rack B · Pos 4 2 3s
00:22 3" Peony Rack E · Pos 2 3 2s
00:26 4" Crossette Rack C · Pos 5 2 3s
00:30 3" Chrysanthemum Rack D · Pos 3 3 2s
00:34 4" Palm Rack B · Pos 6 2 3s
00:38 3" Strobe Peony Rack F · Pos 1 4 2s
00:42 5" Willow Rack A · Pos 2 2 3s
00:46 3" Comet Mine Rack E · Pos 4 5 2s
00:50 4" Ring Shell Rack C · Pos 8 2 3s
00:54 3" Crossette Rack D · Pos 6 3 2s
00:58 5" Chrysanthemum Rack B · Pos 9 2 3s
01:02 6" Brocade Crown Rack A · Pos 5 2 4s
01:06 3" Peony Rack F · Pos 3 4 2s
01:10 5" Palm Rack C · Pos 2 3 3s
01:13 5" Strobe Peony Rack D · Pos 10 3 3s
01:16 3" Comet Mine Rack A · Pos 6 6 2s
01:19 6" Willow Rack B · Pos 1 2 4s
01:23 3" Chrysanthemum Rack E · Pos 5 5 2s
01:26 5" Crossette Rack F · Pos 7 3 3s
01:30 6" Ring Shell Rack C · Pos 9 2 4s
01:34 3" Strobe Peony Rack D · Pos 2 6 2s
01:37 5" Chrysanthemum Rack A · Pos 4 3 3s
01:40 8" Brocade Crown Rack B · Pos 8 2 5s
01:44 4" Palm Rack E · Pos 1 4 3s
01:48 5" Willow Rack F · Pos 6 3 3s
01:52 3" Comet Mine Rack C · Pos 3 7 2s
01:56 6" Chrysanthemum Rack D · Pos 5 2 4s
02:00 5" Ring Shell Rack A · Pos 7 3 3s
02:04 3" Peony Rack B · Pos 10 5 2s
02:08 Waterfall Curtain Front Rack · Full Span 1 14s
02:12 Gerb Fountain Array Rack A-F · Ground Line 12 10s
02:20 4" Willow Rack C · Pos 4 2 3s
02:24 4" Palm Rack D · Pos 8 2 3s
02:28 3" Strobe Peony Rack B · Pos 5 3 2s
02:32 5" Chrysanthemum Rack A · Pos 2 3 3s
02:35 5" Crossette Rack E · Pos 6 3 3s
02:39 6" Willow Rack C · Pos 1 2 4s
02:42 3" Comet Mine Rack F · Pos 9 6 2s
02:46 5" Palm Rack B · Pos 3 3 3s
02:49 6" Brocade Crown Rack D · Pos 7 2 4s
02:52 3" Chrysanthemum Rack A · Pos 10 6 2s
02:56 8" Ring Shell Rack C · Pos 6 2 5s
02:59 5" Strobe Peony Rack E · Pos 2 4 3s
03:03 5" Willow Rack B · Pos 8 3 3s
03:06 3" Comet Mine Rack D · Pos 4 7 2s
03:09 6" Chrysanthemum Rack F · Pos 5 3 4s
03:12 5" Crossette Rack A · Pos 6 4 3s
03:15 3" Peony Rack C · Pos 2 8 2s
03:18 6" Ring Shell All Racks 8 3s
03:20 4" Comet Mine All Racks 10 2s
03:22 5" Chrysanthemum Rack A-C 9 3s
03:24 3" Strobe Peony Rack D-F 12 2s
03:26 6" Crossette Rack A-C 8 3s
03:28 4" Willow Rack D-F 11 2s
03:30 8" Brocade Crown All Racks 6 4s
03:33 3" Comet Mine All Racks 14 2s
03:36 6" Palm All Racks 9 3s
03:39 4" Chrysanthemum All Racks 13 2s
03:42 8" Ring Shell All Racks 7 4s
03:45 3" Strobe Peony All Racks 15 2s
03:48 6" Crossette All Racks 10 3s
03:51 4" Comet Mine All Racks 16 2s
03:54 10" Multi-Break Chrysanthemum All Racks 8 5s
03:57 10" Titanium Salute All Racks 10 3s
03:59 12" Finale Shell All Racks 18 6s
Signature tool 03

Star chemistry — what actually makes the color

Real metal-salt chemistry, not a paint chart: every firework color is a specific compound burning at a specific temperature, and some colors are genuinely harder to produce than others.

SrCO₃ / Sr(NO₃)₂

1,700–1,800K (1,427–1,527°C)

The standard signal-red colorant in display fireworks; strontium monochloride (SrCl) is the actual light-emitting species formed in the flame.

General reference: Conkling & Mocella, Chemistry of Pyrotechnics. Temperatures are typical ranges for well-formulated color compositions, not single measured values.

How we work

Six steps, every display

  1. 01

    Site survey

    We walk the launch site and fallout zone in person, measure real distances against NFPA 1123, and flag wind, structures, and crowd-line constraints before anything is designed.

  2. 02

    Choreography design

    For music-synced shows, we build the cue sheet against the actual track timing — beat by beat, not a generic template stretched to fit.

  3. 03

    Permitting & NFPA compliance

    Our site plan, shell manifest, and insurance certificate go to the local Fire Marshal or Authority Having Jurisdiction ahead of the display for formal approval.

  4. 04

    Rehearsal & setup

    Mortars are racked, wired, and function-tested against the cue sheet the day of the show — every position checked before the site opens to guests.

  5. 05

    Live execution

    A licensed lead technician fires the show, with a dedicated safety officer watching the crowd line and a standby crew for any misfire.

  6. 06

    Cleanup

    Full site sweep for unexploded debris the same night, with a follow-up daylight sweep the next morning before the site is released.

From clients

“They handed us the actual minimum-distance math before we picked the shell sizes — our venue coordinator had never seen a fireworks vendor show their work like that.”

— Renata, Corporate Gala, Providence

“Every shell landed on the beat. We sent them the final mix two weeks out and the cue sheet matched it to the second on the night.”

— Marcus, Wedding, Newport

“Our fire marshal approved the site plan on the first submission — no back-and-forth. That alone was worth the contract.”

— Chief Delgado, Municipal July 4th Celebration

“They asked about our low-smoke requirements before we even brought it up — the venue has strict air-quality rules and they already knew the compliant compositions.”

— Priya, Concert Pyrotechnics, Boston

Start with a site plan, not a sales pitch

Tell us about the event, and we'll bring a first-pass NFPA distance plan and shell-count budget to the initial call.

(617) 555-0198